top of page
Deluge Project.png

Onshore Deluge Study

A new gas receiving facility was at FEED. The end client required the EPC contractor to engage a 3rd party to design the deluge system, at which point RJE Risk Consultants was engaged in the project.

Expert advice was provided with regards to Energy Institute guidance IP19 to clarify the scope and requirements of the Basis of Design. Once agreed with the EPC and end client, the process design for deluge system was completed using REFlow© in line with NFPA 25 and other relevant design guidance.